Skip to main content

NOVTRIQ / Technical Due Diligence

⚡ 72-Hour Preliminary Report Delivery

Technical Due Diligence
as a Service

Multi-discipline automated preliminary reports — Structural, MEP, Compliance, Energy, and Risk — validated by qualified NOVTRIQ engineers. Trusted by developers, investors, and PMC firms across UK, EU, and UAE.

72hPreliminary report delivery
5Engineering disciplines
£2,500Starting from
20+Years structural expertise

What is a Technical Due Diligence Report?

A Technical Due Diligence (TDD) assessment provides an independent, objective analysis of a building or asset's technical condition before a transaction, investment decision, or asset lifecycle event.

NOVTRIQ delivers AI-powered Preliminary TDD reports — combining automated data analysis, regulatory cross-referencing, and multi-discipline engineering logic — validated and signed by a qualified NOVTRIQ engineer. Our reports flag critical risks, compliance gaps, and material issues across five engineering disciplines within 72 hours of receiving inputs.

All reports are clearly labelled as Preliminary and Indicative. For transactions requiring statutory-grade certification, NOVTRIQ can coordinate full site inspection and certified DD services through our partner network.

72-Hour Delivery

Preliminary report delivered within 72 hours of data submission — no site visit required for initial assessment.

🏗️

Multi-Discipline

Five disciplines covered in a single integrated report: Structural, MEP, Compliance, Energy, and Risk.

🤖

AI-Assisted Analysis

Automated cross-referencing against current regulatory frameworks, energy benchmarks, and compliance databases.

Engineer-Validated

Every report is reviewed and validated by a qualified NOVTRIQ engineer before delivery — no unreviewed AI output.

🌍

UK, EU & UAE

Regulatory coverage across UK Building Regulations, EU directives (EPBD, NIS2), and UAE/ADBC codes.

🔒

Confidential & Secure

All submitted data processed under GDPR-compliant protocols. NDA available on request.

Five Engineering Disciplines — One Report

Each NOVTRIQ TDD report covers five inter-related engineering domains, producing an integrated risk and compliance picture rather than five isolated assessments.

🏛️

Structural

Foundation condition assessment, structural system identification, material risk flags, loading adequacy review, and historic alteration analysis. Cross-referenced against Eurocode / BS standards.

⚙️

MEP

Mechanical, Electrical, and Plumbing systems review. Age and condition assessment of HVAC, LV distribution, plumbing, fire detection, and BMS/controls. Residual life estimate included.

📋

Compliance

Statutory compliance gap analysis across UK Building Regulations, EU EPBD, fire safety, planning conditions, accessibility (BS 8300), and applicable environmental regulations.

🌿

Energy

Energy Performance Certificate (EPC/DEC) review, EPBD III gap analysis, estimated operational carbon, renewable integration feasibility, and EU Taxonomy alignment assessment.

⚠️

Risk

Aggregated risk register across all disciplines. Items scored by likelihood and impact, with recommended actions, cost-band estimates, and timeline for remediation.

🔐

OT/BMS Cybersecurity ADD-ON

NIS2 Directive OT readiness assessment for buildings with connected BMS, SCADA, or smart building systems. Available as an add-on discipline for an additional fee.

From Request to Report in 72 Hours

No site visits required for the Preliminary TDD. Our process is designed for rapid deployment — ideal for transaction pipelines, portfolio reviews, and early-stage investment screening.

1
Day 0

Submit Request & Building Data

Complete the request form and upload available documentation: existing reports, planning drawings, EPC certificates, tenancy schedules, and maintenance records. Secure upload portal provided.

2
Day 0–1

Scoping & Confirmation

A NOVTRIQ engineer reviews submitted data, confirms scope, identifies any gaps, and provides a fixed-price quotation. Engagement letter and NDA (if required) issued within 4 hours.

3
Day 1–2

AI Analysis & Engineer Review

NOVTRIQ's AI engine cross-references submitted data against regulatory databases, benchmarks, and risk models across all five disciplines. A qualified engineer reviews, annotates, and validates all outputs.

4
Day 2–3

Preliminary Report Delivered

Structured PDF report delivered within 72 hours. Includes executive summary, discipline findings, risk register, photographic evidence (where available), and recommended next steps.

5
Optional

Full TDD or Specialist Follow-Up

Where the preliminary report flags material risks, NOVTRIQ can coordinate a full statutory TDD with site inspection, specialist surveys (structural, asbestos, ground investigation), and certified sign-off.

What the Report Includes

All Preliminary TDD reports follow a standardised NOVTRIQ format for consistency and comparability across assets.

Report SectionPreliminaryFull TDD
Executive Summary & Risk Score
Structural Assessment
MEP Systems Review
Compliance Gap Analysis
Energy & Carbon Assessment
Risk Register (scored)
Cost Band EstimatesIndicative
Site Inspection Evidence
Specialist Survey Results
Engineer Certified Sign-offValidated
OT/BMS Cybersecurity (NIS2)Add-onAdd-on

All NOVTRIQ Preliminary TDD reports are clearly labelled as indicative assessments based on submitted documentation. Results require validation for transaction use by a chartered engineer and should not be relied upon as statutory certification.

Transparent, Fixed-Price Engagements

All pricing is fixed at scoping stage — no hourly surprises. Scope-based pricing provided for complex portfolios or multi-site assessments.

Preliminary

£2,500

Single asset · Up to 5,000 m²

  • 5-discipline preliminary assessment
  • 72-hour delivery
  • AI analysis + engineer validation
  • Risk register (scored)
  • Executive summary PDF report
  • 1x 30-min engineer debrief call
Request Preliminary TDD

Portfolio

Custom

Multi-asset · Portfolio pricing

  • All Standard inclusions
  • Portfolio-level risk aggregation
  • Multi-asset comparative matrix
  • Custom scope on request
  • Dedicated NOVTRIQ contact
  • Priority turnaround available
Discuss Portfolio Scope

Prices shown exclude VAT. OT/BMS Cybersecurity add-on from £850. Full certified TDD with site inspection scoped separately.

Frequently Asked Questions

Questions about scope, use of results, or process? Contact us at hello@novtriq.tech

Can the Preliminary TDD be used for transactions?
The Preliminary TDD is an indicative assessment based on submitted documentation and is not a substitute for a full statutory due diligence report. It is designed for early-stage screening, investment committee presentations, and risk identification. For transactions requiring certified, lender-grade reporting, NOVTRIQ can coordinate a full TDD through our specialist partner network.
What documentation do I need to provide?
The more documentation available, the more detailed the analysis. Useful inputs include: as-built drawings, existing surveys or reports, EPC certificates, maintenance records, planning permissions, and tenancy schedules. NOVTRIQ can still produce a report with limited documentation — gaps will be clearly flagged in the risk register.
Which geographies do you cover?
NOVTRIQ covers UK (England, Wales, Scotland), EU Member States, and UAE (ADBC, Dubai/Trakhees). Reports are produced against the relevant national and supranational regulatory frameworks for each jurisdiction. Cross-border assets can be assessed with dual-jurisdiction reporting.
How is confidentiality managed?
All submitted data is handled under GDPR-compliant protocols. A mutual NDA is available and can be executed before any data is transferred. Documents are stored on encrypted, access-controlled infrastructure and are deleted upon project completion unless a retention period is agreed.
What types of assets can be assessed?
NOVTRIQ specialises in commercial real estate, data centres and critical facilities, industrial and logistics assets, mixed-use developments, and brownfield regeneration sites. Residential blocks (5+ units) can be assessed on request. Heritage or listed assets may require additional specialist input.

Ready to Assess Your Asset?

Submit a request today and receive your Preliminary Technical Due Diligence report within 72 hours. Fixed price. No surprises.