UAE Grid Connection Checker

Pre-assessment tool for grid connection requirements across UAE utilities — DEWA, ADDC, SEWA and FEWA. Estimate connection type, transformer sizing, NOC process and documentation checklist before formal application.

Enter Your Project Details
Total connected electrical load
Gross plot area for meter room sizing
Expected monthly energy use
DEWA

Dubai Electricity & Water Authority (DEWA)

Connection type and requirements based on your project parameters.

Transformer Sizing
(kVA)
Est. Connection
Timeline (weeks)
Connection
Category

Required Documentation Checklist

    NOC Process Overview

      Meter Room Requirements

      Green Building Compliance

      UAE Utility Overview

      Each emirate is served by a distinct utility authority with its own application procedures, technical standards and service levels.

      DEWA Dubai

      Dubai Electricity & Water Authority serves the Emirate of Dubai. LV connections up to 200kW are processed through the online portal. Loads above 200kW require an MV supply and a dedicated substation. NOC typically takes 4–8 weeks for standard commercial projects.

      dewa.gov.ae — 04 601 9999

      ADDC / ADWEA Abu Dhabi

      Abu Dhabi Distribution Company covers Abu Dhabi city and Al Ain. Projects above 150kW typically require MV connection. Abu Dhabi mandates Estidama Pearl Rating compliance for new buildings — minimum 1 Pearl for private, 2 Pearl for government.

      addc.ae — 800 2332

      SEWA Sharjah

      Sharjah Electricity, Water & Gas Authority serves Sharjah, Khor Fakkan and Kalba. LV supply available up to 160kW. Larger loads require MV at 11kV. Applications through Sharjah eServices portal; technical approval from SEWA Engineering is mandatory before construction.

      sewa.gov.ae — 06 528 8888

      FEWA RAK, Fujairah, Ajman, UAQ

      Federal Electricity & Water Authority serves Ras Al Khaimah, Fujairah, Ajman and Umm Al Quwain. Uniform technical standards apply across all four emirates. MV threshold is 100kW. Processing times are generally 6–10 weeks. Green building requirements follow UAE Green Building Council guidelines.

      fewa.gov.ae — 06 746 2222